<menu id="iysgm"></menu><menu id="iysgm"><strong id="iysgm"></strong></menu>
<dd id="iysgm"></dd>
  • <menu id="iysgm"></menu><nav id="iysgm"><code id="iysgm"></code></nav>
  • <xmp id="iysgm">
    <optgroup id="iysgm"></optgroup>
  • Welcome: Shanghai Suren Machinery Manufacturing Co., Ltd.
    Language: Chinese ∷  English

    Company new

    Set-up machine installation - safety requirements - Shanghai Su Ren

      1. The sleeve labeling machine arrives at the scene. Before installation, the damage inspection must be carried out to check whether the frame is deformed. The electrical cabinet is not damp, especially if all parts are inspected for damage (such as collision marks).

       2. When the device is not fully positioned, please do not remove the package. You can use the forklift to carry it. Please insert it from the bottom of the front of the machine.

       3. Please do not cover the heat-dissipating fan of the obstruction or electrical cabinet to ensure good heat dissipation. Otherwise, the temperature of the electrical components will be too high, resulting in equipment damage and equipment stability.

       4. Confirm that the power supply meets the working power requirements of the device. If the voltage does not match, it may cause damage to the components of the electrical components.

      (This information is provided by Shanghai Suren Machinery Manufacturing Co., Ltd.)


    CONTACT US

    Contact: Wendy Jiang

    Phone: 0086-13482266656

    Tel: 0086-21-33657068

    Email: 2675163405@qq.com

    Add: No.88 Huangcheng North Road, Fengxian, Shanghai,China

    成全高清视频免费观看